Replacement of Intranuclear detectors
Replacing thimbles
Replacing high and low pressure seals
Thimble cleaning
Cutting and sentencing of thimbles
Maintenance of safety valves
Renewal of wiring 5 and 10-way transfer units (internal and
aerial)
Encoder overhead wiring renewal
Renewal coaxial cable and replacement detector connector in drive unit
Renewal of internal wiring and drive unit control panel
Renewal of internal wiring and drive unit control panel
Thermography and reflectometry.